
A1 Class Fireproof Fast Assembling Container Office from Ante House, a China manufacturer with direct factory control. As a reliable supplier, we guarantee A1 non‑combustible glass wool panels, 1‑hour assembly (4 workers/unit), full production line quality. Ante House: fire safety + speed.
The A1 Class Fireproof Fast Assembling Container Office is a non-combustible modular unit built for sites where fire safety is the top priority. It combines an A1‑rated glass wool sandwich panel, a cold‑galvanised steel frame, and a standardised production process. Each unit leaves the factory fully pre‑cut, pre‑welded, and pre‑painted. On site, four workers assemble one unit in one hour. This product serves oil camps, chemical plants, construction sites near forests, hospital expansions, school temporary classrooms, and refugee housing where fire codes are strictly enforced.
Site safety officers, project engineers, facility managers, emergency housing coordinators, and mining camp operators. Any operation that requires a secure, fast‑to‑deploy office, clinic, control room, or dormitory that will not burn or spread flames. The two‑, three‑, or four‑layer stacking ability multiplies usable floor area without compromising fire resistance.
| Parameter | Value |
| Outside size (L*W*H) | 5810mm * 2330mm * 2540mm |
| Inside size (L*W*H) | 5650mm * 2170mm * 2160mm |
| Packing size (L*W*H) | 5810mm * 2350mm * 73mm |
| Main frame steel thickness | 3.0mm cold galvanised (2.2/2.5/4.0mm optional) |
| Column size | 210mm*150mm, 3.0mm thick, 4 downspouts, 8.0mm connectors |
| Door | Steel door 950mm*1970mm (customisable) |
| Window | PVC double‑layer glass 1150mm*1150mm, 5+9+5mm |
| Wall panel | 50/75/100mm glass wool sandwich panel (A1 class) |
| Floor | 18mm cement board + 2.0mm leather (tile/wood optional) |
| Colour | White frame & wall (any RAL on request) |
Loading capacity: 20GP holds 6 units, 40HQ holds 12 units. Two units can be stacked vertically to form a two‑storey Fireproof Fast Assembling Container Office with external staircase.
The wall system uses glass wool core (density ≥64kg/m³) sandwiched between two layers of galvanised steel sheet (0.4‑0.6mm). This assembly has passed the ISO 1182 test for non‑combustibility. Flame spread index = 0, smoke developed index = 0. No dripping, no toxic fume emission under direct flame. The steel frame is cold‑formed and coated with intumescent paint that delays temperature rise. For electrical lines, pre‑installed conduits are fire‑resistant and separated from insulation. This makes the Fireproof Fast Assembling Container Office suitable for temporary hospitals, emergency shelters, and any site with strict fire marshal approval.
Standardised components: Every hole is pre‑punched, every panel edge is pre‑sealed. No cutting or drilling on site. Four general workers with basic tools (socket wrench, level, ladder) complete one unit in 60 minutes. For a 20‑unit site office, assembly finishes in two working days. Foundation required: only four concrete pads or compacted gravel. No crane needed for single‑storey. For two‑storey, a small forklift or manual hoist lifts the upper unit. The fast assembly directly reduces labour cost and project idle time.
Two owned factories, total 20,000m² plant area. Equipment list: six steel sheet press machines, six welding production lines, two baking paint rooms, one sandwich panel wall line. Every component – from raw steel coil to finished panel – is processed under one roof. No subcontracting. This vertical integration ensures that the A1 Class Fireproof Fast Assembling Container Office has zero hidden defects. Welding seams are 100% inspected. Panel flatness is laser‑checked. Baking paint thickness is measured with coating gauge. Random units undergo full mock‑up assembly and water spray test before packing.
1. Fire rating: Many prefab offices claim “fire resistant” but only reach B or C class. This product delivers A1 – the highest non‑combustible grade.
2. Speed vs safety trade‑off: Fast assembling usually means combustible materials (wood, foam). Here, glass wool + steel keeps both speed and safety.
3. Longevity: 30‑year design life for steel frame, same as conventional building. Paint system resists corrosion for 10+ years in normal atmosphere.
4. Engineering support: Six in‑house engineers with >10 years experience; over 20 patents held for fire‑safe connections and panel edge seals.
5. Multi‑layer stacking: Single unit fire rating does not degrade when stacked two, three, or four high. Inter‑unit fire stops are provided.
Free design service: CAD floor plans and 3D visualisation delivered before production. Optional power supply, water supply, drainage, distribution box, sockets, LED lamps, washbasin, toilet, shower cabinet – all pre‑installed in factory.
More than 150 high‑quality projects completed worldwide. Examples that prove the fireproof and fast‑assembly claim:
- 800 refuge houses for Iraqi government (2023) – used as fire‑safe shelters in desert camps. Assembled 120 units in 15 days.
- 500 flat pack container houses to Russia (2024) – used as site offices in oil refineries. Local fire inspection passed with zero corrections.
- 120 apple cabins in Canada (2024) – forest‑adjacent worker housing. Local fire marshal approved A1 panels.
- 50 units in UK (2024) – school temporary classrooms. Achieved building control sign‑off within one week of delivery.
Exported to Southeast Asia, Middle East, Africa, South America, Russia, and over 80 countries. All China mainland provinces also use this system for temporary fire stations and emergency command centres.
Strong wind region: Internal bracing upgraded, tie‑down anchors added. Frame remains A1 fire class because steel is non‑combustible.
Cold region: Increase wall panel thickness to 100mm glass wool. Keep A1 rating – glass wool is naturally non‑combustible. Anti‑pressure roof purlins added for snow load.
High corrosion region (coastal/chemical): Use anti‑corrosive primer + topcoat. Fire performance unchanged because paint is intumescent and tested together.
Hot & humid: Optional ventilated roof gap and reflective paint. Glass wool does not absorb moisture when facings are intact.
The A1 Class Fireproof Fast Assembling Container Office maintains its fire classification across all adaptations because the core insulation and steel frame never change.
Design quality: Engineers simulate fire propagation, wind load, seismic stress using FEA. Problem points eliminated in digital model.
Raw material quality: Certificates for galvanised steel (Q235B/Q355B), glass wool (A1 fire report, density report), PVC double‑glass, seals (weather‑proof).
Production quality: Each welding seam visually inspected + random ultrasonic test. Sandwich panel flatness checked by laser. Paint thickness measured at 3 points per panel.
Final inspection: 5% of each batch fully assembled, water‑sprayed for 30 minutes, door/window operation tested.
Warranty: 2 years covering frame corrosion, panel delamination, seal failure, connection hardware. Within warranty period, Ante House replaces or repairs any production‑related defect at no cost. Delivery time: 7‑10 days after deposit for standard orders; large orders negotiated separately.
Every project receives detailed installation instruction drawings (step‑by‑step) and a video showing actual assembly of the A1 Class Fireproof Fast Assembling Container Office. For large projects (≥50 units), assembly supervisors can be sent on site. The on‑site service fee is negotiated based on duration and travel. Free full‑cycle technical consultancy: from foundation drawing to final handover. For two‑storey or higher, structural calculation report is provided.
How does the fire rating affect cost?
Glass wool and thicker steel add approx 15‑20% to material cost compared to EPS or PU panels. But the A1 rating eliminates fire‑insurance premium increase and allows use in regulated zones. Long‑term total cost is lower.
Can windows be added without losing A1?
Yes. PVC double‑glass windows have a steel frame and are surrounded by non‑combustible seals. The window area is limited to ≤20% of wall surface per fire code.
What about electrical outlets inside?
Pre‑installed conduits are metal or fire‑retardant PVC, positioned away from insulation. Junction boxes are steel.
Is the product certified by third parties?
Internal testing follows ISO standards. Certificates can be provided for each batch upon request.
What is the maximum stacking height?
Four layers with proper bolted connections and wind bracing. Structural engineer approval required for local seismic/wind conditions – provided free.
Ante House operates its own full production line since 2013, located near highway, airport, and sea port – enabling rapid export. The management philosophy is “quality and multi‑win”. Every A1 Class Fireproof Fast Assembling Container Office is built by experienced workers (average 8 years in prefab steel). The company holds 20+ patents, many specifically for fire‑safe joint designs and panel edge sealing. With two factories covering 20,000m², Ante House controls every gram of steel and every panel of insulation. 2‑year warranty is backed by a written commitment. 30‑year design life for steel frame is based on real corrosion tests and load cycles. For projects that demand fire safety without sacrificing assembly speed, Ante House is the verified partner. Free design, full technical data, and on‑site supervision options are available. Choose engineering that passes the flame test.